{"id":9864,"date":"2020-12-02T13:50:23","date_gmt":"2020-12-02T19:50:23","guid":{"rendered":"https:\/\/blog.misumiusa.com\/?p=9864"},"modified":"2020-12-04T12:01:50","modified_gmt":"2020-12-04T18:01:50","slug":"white-paper-capital-waste-reduction-in-manufacturing","status":"publish","type":"post","link":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/","title":{"rendered":"Capital Waste Reduction in Manufacturing"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Executive Summary<\/strong><br>Competing in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique and expensive types such as industrial-grade robot and heavy-duty power cables. Manufacturers are forced to buy much more cable than they need. Unused cable is eventually discarded thereby wasting both material and cash.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The solution is for a manufacturer to only order what they need. While simple on the surface, it is difficult to predict how much cable will be needed. If a machine shuts down because of a broken cable, then it is critical to have spares on hand. However, a manufacturer still does not need to buy more than what will keep them running. Therefore, it is important to work with a supplier that can provide cables in<br>either specific lengths or smaller spools to reduce waste.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">MISUMI offers both. As a supplier of automation equipment, we provide smaller spools of cable and perform custom cuts to eliminate waste. Utilizing these services can help a manufacturer reduce overall<br>maintenance material investment by up to 60%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For more information, download our White Paper Below.<\/p>\n\n\n\n<div class=\"wp-block-file alignleft\"><a href=\"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/11\/MISUMI-White-Paper-Capital-Waste-Reduction-In-Manufacturing-2020.pdf\">MISUMI-White-Paper-Capital-Waste-Reduction-In-Manufacturing-2020<\/a><a href=\"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/11\/MISUMI-White-Paper-Capital-Waste-Reduction-In-Manufacturing-2020.pdf\" class=\"wp-block-file__button\" download><span style=\"color:#ffc525\" class=\"has-inline-color\"><strong>Download<\/strong><\/span><\/a><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique and expensive types such as [&hellip;]<\/p>\n","protected":false},"author":59,"featured_media":9880,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"footnotes":""},"categories":[917],"tags":[794,842,985,823],"class_list":["post-9864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-white-papers","tag-cable","tag-electrical","tag-save-cost","tag-white-paper"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Patrick Teagues\"\/>\n\t<meta name=\"google-site-verification\" content=\"QwaqEjZx4CWzex2BzSRe0fIKP303dZjHd7EihVrq6mE\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"MISUMI Mech Lab Blog |\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog\" \/>\n\t\t<meta property=\"og:description\" content=\"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-12-02T19:50:23+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2020-12-04T18:01:50+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#article\",\"name\":\"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog\",\"headline\":\"Capital Waste Reduction in Manufacturing\",\"author\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/author\\\/patrickteagues\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg\",\"width\":900,\"height\":500},\"datePublished\":\"2020-12-02T13:50:23-06:00\",\"dateModified\":\"2020-12-04T12:01:50-06:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#webpage\"},\"articleSection\":\"White Papers, cable, electrical, save cost, white paper\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blog.misumiusa.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/category\\\/white-papers\\\/#listItem\",\"name\":\"White Papers\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/category\\\/white-papers\\\/#listItem\",\"position\":2,\"name\":\"White Papers\",\"item\":\"https:\\\/\\\/blog.misumiusa.com\\\/category\\\/white-papers\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#listItem\",\"name\":\"Capital Waste Reduction in Manufacturing\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#listItem\",\"position\":3,\"name\":\"Capital Waste Reduction in Manufacturing\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/category\\\/white-papers\\\/#listItem\",\"name\":\"White Papers\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/#organization\",\"name\":\"Misumi USA\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/RGB_Main_Horizontal-CLEAR.png\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#organizationLogo\",\"width\":2061,\"height\":474},\"image\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/author\\\/patrickteagues\\\/#author\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/author\\\/patrickteagues\\\/\",\"name\":\"Patrick Teagues\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a71b39d060b6f8a6122f3c3b2878c21d272d8ff0f8fc337999a34d6f1c7e5f0?s=150&#038;d=mm&#038;r=gforcedefault=1\",\"width\":96,\"height\":96,\"caption\":\"Patrick Teagues\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#webpage\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/\",\"name\":\"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog\",\"description\":\"Executive SummaryCompeting in today\\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/author\\\/patrickteagues\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/author\\\/patrickteagues\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#mainImage\",\"width\":900,\"height\":500},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/white-paper-capital-waste-reduction-in-manufacturing\\\/#mainImage\"},\"datePublished\":\"2020-12-02T13:50:23-06:00\",\"dateModified\":\"2020-12-04T12:01:50-06:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/#website\",\"url\":\"https:\\\/\\\/blog.misumiusa.com\\\/\",\"name\":\"MISUMI Blog\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/blog.misumiusa.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog","description":"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique","canonical_url":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"QwaqEjZx4CWzex2BzSRe0fIKP303dZjHd7EihVrq6mE","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#article","name":"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog","headline":"Capital Waste Reduction in Manufacturing","author":{"@id":"https:\/\/blog.misumiusa.com\/author\/patrickteagues\/#author"},"publisher":{"@id":"https:\/\/blog.misumiusa.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg","width":900,"height":500},"datePublished":"2020-12-02T13:50:23-06:00","dateModified":"2020-12-04T12:01:50-06:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#webpage"},"isPartOf":{"@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#webpage"},"articleSection":"White Papers, cable, electrical, save cost, white paper"},{"@type":"BreadcrumbList","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com#listItem","position":1,"name":"Home","item":"https:\/\/blog.misumiusa.com","nextItem":{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com\/category\/white-papers\/#listItem","name":"White Papers"}},{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com\/category\/white-papers\/#listItem","position":2,"name":"White Papers","item":"https:\/\/blog.misumiusa.com\/category\/white-papers\/","nextItem":{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#listItem","name":"Capital Waste Reduction in Manufacturing"},"previousItem":{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#listItem","position":3,"name":"Capital Waste Reduction in Manufacturing","previousItem":{"@type":"ListItem","@id":"https:\/\/blog.misumiusa.com\/category\/white-papers\/#listItem","name":"White Papers"}}]},{"@type":"Organization","@id":"https:\/\/blog.misumiusa.com\/#organization","name":"Misumi USA","url":"https:\/\/blog.misumiusa.com\/","logo":{"@type":"ImageObject","url":"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2017\/04\/RGB_Main_Horizontal-CLEAR.png","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#organizationLogo","width":2061,"height":474},"image":{"@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/blog.misumiusa.com\/author\/patrickteagues\/#author","url":"https:\/\/blog.misumiusa.com\/author\/patrickteagues\/","name":"Patrick Teagues","image":{"@type":"ImageObject","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/5a71b39d060b6f8a6122f3c3b2878c21d272d8ff0f8fc337999a34d6f1c7e5f0?s=150&#038;d=mm&#038;r=gforcedefault=1","width":96,"height":96,"caption":"Patrick Teagues"}},{"@type":"WebPage","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#webpage","url":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/","name":"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog","description":"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/blog.misumiusa.com\/#website"},"breadcrumb":{"@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#breadcrumblist"},"author":{"@id":"https:\/\/blog.misumiusa.com\/author\/patrickteagues\/#author"},"creator":{"@id":"https:\/\/blog.misumiusa.com\/author\/patrickteagues\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg","@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#mainImage","width":900,"height":500},"primaryImageOfPage":{"@id":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/#mainImage"},"datePublished":"2020-12-02T13:50:23-06:00","dateModified":"2020-12-04T12:01:50-06:00"},{"@type":"WebSite","@id":"https:\/\/blog.misumiusa.com\/#website","url":"https:\/\/blog.misumiusa.com\/","name":"MISUMI Blog","inLanguage":"en-US","publisher":{"@id":"https:\/\/blog.misumiusa.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"MISUMI Mech Lab Blog |","og:type":"article","og:title":"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog","og:description":"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique","og:url":"https:\/\/blog.misumiusa.com\/white-paper-capital-waste-reduction-in-manufacturing\/","og:image":"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg","og:image:secure_url":"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg","og:image:width":900,"og:image:height":500,"article:published_time":"2020-12-02T19:50:23+00:00","article:modified_time":"2020-12-04T18:01:50+00:00","twitter:card":"summary","twitter:title":"Capital Waste Reduction in Manufacturing | MISUMI Mech Lab Blog","twitter:description":"Executive SummaryCompeting in today\u2019s manufacturing environment requires new and creative thinking to save money. Operational complexities hide preventable costs that tie up cash in unprofitable segments of the business. Revealing these hiding spots and making improvements can generate real savings. One contributor to waste is spare electrical automation cabling for machine maintenance.Automation equipment requires unique","twitter:image":"https:\/\/blog.misumiusa.com\/wp-content\/uploads\/2020\/12\/Cut-to-Length-Hook-Up-Wire-900x500-1.jpg"},"aioseo_meta_data":{"post_id":"9864","title":null,"description":"","keywords":"","keyphrases":null,"canonical_url":"","og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"open_ai":null,"created":"2021-01-13 14:33:59","updated":"2023-03-22 15:46:29","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"gutentor_comment":0,"_links":{"self":[{"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/posts\/9864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/users\/59"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/comments?post=9864"}],"version-history":[{"count":3,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/posts\/9864\/revisions"}],"predecessor-version":[{"id":9938,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/posts\/9864\/revisions\/9938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/media\/9880"}],"wp:attachment":[{"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/media?parent=9864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/categories?post=9864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.misumiusa.com\/wp-json\/wp\/v2\/tags?post=9864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}