Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Straight Pilot Punches for Fixing to Stripper Plates Normal, Lapping, TiCN Coating, Tip R type (Part Numbers)

Straight Pilot Punches for Fixing to Stripper Plates Normal, Lapping, TiCN Coating, Tip R type

  • FLANGE
  • SKH51
  • SKD11
  • POWDER HSS
  • TiCN
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Material Surface treatment No. (Nominal diameter)
(mm)
L (L dimension)
(mm)
P (Tip dimension)
(mm)
- 5 Days Compliant SKD11 Equivalent None 5 10~40 4~5
- 5 Days Compliant SKD11 Equivalent None 6 10~40 5~6
- 5 Days Compliant SKD11 Equivalent None 8 10~40 6~8
- 5 Days Compliant SKD11 Equivalent None 10 10~40 8~10
- 5 Days Compliant SKD11 Equivalent None 13 10~40 10~13
- 5 Days Compliant SKD11 Equivalent None 16 10~40 13~16
- 5 Days Compliant SKH51 Equivalent None 1.6 10~40 0.5~1.6
- 5 Days Compliant SKH51 Equivalent None 2.0 10~40 1~2
- 5 Days Compliant SKH51 Equivalent None 2.5 10~40 1.5~2.5
- 5 Days Compliant SKH51 Equivalent None 3 10~40 2~3
- 5 Days Compliant SKH51 Equivalent None 4 10~40 3~4
- 5 Days Compliant SKH51 Equivalent None 5 10~40 4~5
- 5 Days Compliant SKH51 Equivalent None 6 10~40 5~6
- 5 Days Compliant SKH51 Equivalent None 8 10~40 6~8
- 5 Days Compliant SKH51 Equivalent None 10 10~40 8~10
- 5 Days Compliant SKH51 Equivalent None 13 10~40 10~13
- 5 Days Compliant SKH51 Equivalent None 16 10~40 13~16
- 5 Days Compliant Powdered high-speed steel None 1.6 10~40 0.5~1.6
- 5 Days Compliant Powdered high-speed steel None 2.0 10~40 1~2
- 5 Days Compliant Powdered high-speed steel None 2.5 10~40 1.5~2.5
- 5 Days Compliant Powdered high-speed steel None 3 10~40 2~3
- 5 Days Compliant Powdered high-speed steel None 4 10~40 3~4
- 5 Days Compliant Powdered high-speed steel None 5 10~40 4~5
- 5 Days Compliant Powdered high-speed steel None 6 10~40 5~6
- 5 Days Compliant Powdered high-speed steel None 8 10~40 6~8
- 5 Days Compliant Powdered high-speed steel None 10 10~40 8~10
- 5 Days Compliant Powdered high-speed steel None 13 10~40 10~13
- 5 Days Compliant Powdered high-speed steel None 16 10~40 13~16

Basic Information

Shank type Standard Tip shape Tip R Mounting plate Stripper plate
Shank (mounting part) shape Standard

Configure

Clear All

Specification/Dimensions

  • Type

    • PTFR
    • SPT
    • L-PTFR
    • H-PTFR
    • HTFR
    • H-HTFR
    • L-HTFR
    • L-SPT
  • Shank type

    • Standard
  • Tip shape

    • Tip R
  • Material

    • SKD11 Equivalent
    • SKH51 Equivalent
    • Powdered high-speed steel
  • Surface treatment

    • None
    • TiCN
    • Lapping
  • Mounting plate

    • Stripper plate
  • Shank (mounting part) shape

    • Standard
  • No. (Nominal diameter)(mm)

    • 1.6
    • 2.0
    • 2.5
    • 3
    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
  • L (L dimension)(mm)

    [10-40/0.1mm increments]
  • P (Tip dimension)(mm)

    [0.5-16/0.001mm increments] [0.5-16/0.01mm increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 5 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry