Empowering Engineers with

Configurable Components

Our business hours: Mon. - Fri. 7 a.m. - 9 p.m. ET | Sat. 8 a.m - 5 p.m. ET.

All Categories

Category Search
Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Safety Products
Press Die Components
Plastic Mold Components

Brand Search
Brand List

Pilot Punches for Fixing to Stripper Plates Tip R and Taper Combined type, Minus Head tolerance, Normal, Lapping, TiCN Coating, HW Coating (Part Numbers)

Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Material Surface treatment D (Shank diameter)
(mm)
L (L dimension)
(mm)
P (Tip dimension)
(mm)
PC (Tip dimension alteration)
(mm)
- 5 Days Compliant SKH51 Equivalent HW coating 1.6 10~40 1~1.59
- 5 Days Compliant SKH51 Equivalent HW coating 2.0 10~40 1~1.99
- 5 Days Compliant SKH51 Equivalent HW coating 2.5 10~40 1.5~2.49
- 5 Days Compliant SKH51 Equivalent HW coating 3 10~40 2~2.99
- 5 Days Compliant SKH51 Equivalent HW coating 4 10~40 2~3.99
- 5 Days Compliant SKH51 Equivalent HW coating 4 10~40 1~1.99
- 5 Days Compliant SKH51 Equivalent HW coating 5 10~40 2~4.99
- 5 Days Compliant SKH51 Equivalent HW coating 5 10~40 1~1.99
- 5 Days Compliant SKH51 Equivalent HW coating 6 10~40 2.5~5.99
- 5 Days Compliant SKH51 Equivalent HW coating 6 10~40 1.25~2.49
- 5 Days Compliant SKH51 Equivalent HW coating 8 10~40 5~7.99
- 5 Days Compliant SKH51 Equivalent HW coating 8 10~40 2.5~4.99
- 5 Days Compliant Powdered high-speed steel HW coating 1.6 10~40 1~1.59
- 5 Days Compliant Powdered high-speed steel HW coating 2.0 10~40 1~1.99
- 5 Days Compliant Powdered high-speed steel HW coating 2.5 10~40 1.5~2.49
- 5 Days Compliant Powdered high-speed steel HW coating 3 10~40 2~2.99
- 5 Days Compliant Powdered high-speed steel HW coating 4 10~40 2~3.99
- 5 Days Compliant Powdered high-speed steel HW coating 4 10~40 1~1.99
- 5 Days Compliant Powdered high-speed steel HW coating 5 10~40 2~4.99
- 5 Days Compliant Powdered high-speed steel HW coating 5 10~40 1~1.99
- 5 Days Compliant Powdered high-speed steel HW coating 6 10~40 2.5~5.99
- 5 Days Compliant Powdered high-speed steel HW coating 6 10~40 1.25~2.49
- 5 Days Compliant Powdered high-speed steel HW coating 8 10~40 5~7.99
- 5 Days Compliant Powdered high-speed steel HW coating 8 10~40 2.5~4.99
- 5 Days Compliant SKD11 Equivalen None 1.6 10~40 1~1.59
- 5 Days Compliant SKD11 Equivalen None 2.0 10~40 1~1.99
- 5 Days Compliant SKD11 Equivalen None 2.5 10~40 1.5~2.49
- 5 Days Compliant SKD11 Equivalen None 3 10~40 2~2.99
- 5 Days Compliant SKD11 Equivalen None 4 10~40 2~3.99
- 5 Days Compliant SKD11 Equivalen None 4 10~40 1~1.99

Basic Information

Shank type Standard Tip shape Tip R & taper Mounting plate Stripper plate
Shank (mounting part) shape Standard Shank diameter D tolerance m5

Configure

Clear All

Specification/Dimensions

  • Type

    • H-PTFPRF
    • L-HTFPRF
    • H-HTFPRF
    • SPTPF
    • HW-PTFPRF
    • PTFPRF
    • HW-HTFPRF
    • L-SPTPF
    • L-PTFPRF
    • HTFPRF
  • Shank type

    • Standard
  • Tip shape

    • Tip R & taper
  • Material

    • SKD11 Equivalen
    • SKH51 Equivalent
    • Powdered high-speed steel
  • Surface treatment

    • None
    • TiCN
    • HW coating
    • Lapping
  • Mounting plate

    • Stripper plate
  • Shank (mounting part) shape

    • Standard
  • Shank diameter D tolerance

    • m5
  • D (Shank diameter)(mm)

    • 1.6
    • 2.0
    • 2.5
    • 3
    • 4
    • 5
    • 6
    • 8
  • L (L dimension)(mm)

    [10-40/0.1mm increments]
  • P (Tip dimension)(mm)

    [1-7.99/0.001mm increments] [1-7.99/0.01mm increments]
  • PC (Tip dimension alteration)(mm)

    [1-4.99/0.01mm increments] [1-4.999/0.001mm increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 5 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext. 370) / FAX:847-843-9107
Mon. - Fri. 9 a.m. - 6 p.m. ET
Technical Inquiry