Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Block Punches -Configurable Size Type- (Part Numbers)

Click this image to zoom it.

VOID

  • SKH51
  • SKD11
  • POWDER HSS
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Tip shape Material Shank (mounting part) shape F (Flange position designation)
(°)
H (Shank)
(mm)
K (Key groove position designation)
(°)
L (L dimension)
(mm)
LC (Full length alteration)
(mm)
P (Tip dimension)
(mm)
PC (Tip dimension alteration)
(mm)
R (Tip corner R)
(mm)
T (Key groove position)
(mm)
V (Shank)
(mm)
W (Tip dimension)
(mm)
WC (Tip dimension alteration)
(mm)
WF (Flange position designation)
(°)
- 10 Days Compliant R Powdered high-speed steel Standard 8.1~10 32~99.9 5~13 0.15~15 10.1~13 2.5~10
- 10 Days Compliant R Powdered high-speed steel Standard 8.1~10 32~99.9 5~13 0.15~15 10.1~13 1.22~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 40~100 5~13 0.15~15 10.1~13 3~13
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 40~100 5~13 0.15~15 10.1~13 1.52~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 32~99.9 5~13 0.15~15 10.1~13 3~13
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 32~99.9 5~13 0.15~15 10.1~13 1.52~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 40~100 3.03~19.99 0.15~15 10.1~30 3~13
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 40~100 3.03~19.99 0.15~15 10.1~30 1.52~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 32~99.9 3.03~19.99 0.15~15 10.1~30 3~13
- 10 Days Compliant R Powdered high-speed steel Standard 10.1~13 32~99.9 3.03~19.99 0.15~15 10.1~30 1.52~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 3~4 40~70 7~16 0.15~15 13.1~16 1~4
- 10 Days Compliant R Powdered high-speed steel Standard 3~4 40~70 7~16 0.15~15 13.1~16 0.5~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 3~4 32~69.9 7~16 0.15~15 13.1~16 1~4
- 10 Days Compliant R Powdered high-speed steel Standard 3~4 32~69.9 7~16 0.15~15 13.1~16 0.5~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 4.1~5 40~100 7~16 0.15~15 13.1~16 1.2~5
- 10 Days Compliant R Powdered high-speed steel Standard 4.1~5 40~100 7~16 0.15~15 13.1~16 0.62~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 4.1~5 32~99.9 7~16 0.15~15 13.1~16 1.2~5
- 10 Days Compliant R Powdered high-speed steel Standard 4.1~5 32~99.9 7~16 0.15~15 13.1~16 0.62~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 5.1~6 40~100 7~16 0.15~15 13.1~16 1.5~6
- 10 Days Compliant R Powdered high-speed steel Standard 5.1~6 40~100 7~16 0.15~15 13.1~16 0.77~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 5.1~6 32~99.9 7~16 0.15~15 13.1~16 1.5~6
- 10 Days Compliant R Powdered high-speed steel Standard 5.1~6 32~99.9 7~16 0.15~15 13.1~16 0.77~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 6.1~8 40~100 7~16 0.15~15 13.1~16 2~8
- 10 Days Compliant R Powdered high-speed steel Standard 6.1~8 40~100 7~16 0.15~15 13.1~16 0.92~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 6.1~8 32~99.9 7~16 0.15~15 13.1~16 2~8
- 10 Days Compliant R Powdered high-speed steel Standard 6.1~8 32~99.9 7~16 0.15~15 13.1~16 0.92~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 8.1~10 40~100 7~16 0.15~15 13.1~16 2.5~10
- 10 Days Compliant R Powdered high-speed steel Standard 8.1~10 40~100 7~16 0.15~15 13.1~16 1.22~7.49
- 10 Days Compliant R Powdered high-speed steel Standard 8.1~10 32~99.9 7~16 0.15~15 13.1~16 2.5~10
- 10 Days Compliant R Powdered high-speed steel Standard 8.1~10 32~99.9 7~16 0.15~15 13.1~16 1.22~7.49

Basic Information

Shank type Normal With/without jector W/O Surface treatment None

Configure

Clear All

Specification/Dimensions

  • Type

    • FPHFD
    • FHWD
    • FHSKD
    • FPHFG
    • FHSWD
    • FHSPR
    • FHSFD
    • FPHFR
    • FPHKE
    • FHSFE
    • FPHPD
    • FHME
    • FHFR
    • FHKD
    • FHWE
    • FHWG
    • FHSWE
    • FPHKD
    • FHSFR
    • FPHFE
    • FHWR
    • FHKE
    • FPHMD
    • FPHWD
    • FHSKG
    • FHSWR
    • FHFD
    • FHFG
    • FHFE
    • FHMG
    • FHMR
    • FHSMR
    • FPHMG
    • FHKG
    • FHPG
    • FPHWE
    • FHPR
    • FPHMR
    • FHSKE
    • FPHKR
    • FPHKG
    • FHPD
    • FPHWG
    • FHPE
    • FHSKR
    • FPHME
    • FHSPD
    • FHSME
    • FHSPE
    • FHSFG
    • FHMD
    • FPHPE
    • FHSMG
    • FPHPG
    • FPHWR
    • FHKR
    • FHSMD
    • FHSPG
    • FPHPR
    • FHSWG
  • Shank type

    • Normal
  • With/without jector

    • W/O
  • Tip shape

    • D
    • R
    • E
    • G
  • Material

    • SKH51 Equivalent
    • Powdered high-speed steel
    • SKH51 or SKD11 Equivalent
  • Surface treatment

    • None
  • Shank (mounting part) shape

    • Standard
    • Tapped
    • With key groove
    • Single-flanged
    • Double-flanged
  • F (Flange position designation)(°)

    [0-270/90° increments]
  • H (Shank)(mm)

    [3-30/0.1mm increments]
  • K (Key groove position designation)(°)

    [0-270/90° increments]
  • L (L dimension)(mm)

    [40-100/10mm increments]
  • LC (Full length alteration)(mm)

    [32-99.9/0.1mm increments]
  • P (Tip dimension)(mm)

    [2-50/0.01mm increments]
  • PC (Tip dimension alteration)(mm)

    [1-19.99/0.01mm increments]
  • R (Tip corner R)(mm)

    [0.15-15/0.01mm increments]
  • T (Key groove position)(mm)

    [2-95/0.1mm increments]
  • V (Shank)(mm)

    [3-50/0.1mm increments]
  • W (Tip dimension)(mm)

    [1-30/0.01mm increments]
  • WC (Tip dimension alteration)(mm)

    [0.5-7.49/0.01mm increments]
  • WF (Flange position designation)(°)

    [0-270/90° increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 10 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry