Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Block Punch Blanks (Part Numbers)

Click this image to zoom it.

VOID

  • SKH51
  • SKD11
  • POWDER HSS
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Material Shank (mounting part) shape V (Shank)
(mm)
H (Shank)
(mm)
F (Flange position designation)
(°)
K (Key groove position designation)
(°)
L (L dimension)
(mm)
LC (Full length alteration)
(mm)
T (Key groove position)
(mm)
TF (Head position designation)
(°)
WF (Flange position designation)
(°)
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 22 20~99.9 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 25 40~100 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 25 20~99.9 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 28 40~100 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 28 20~99.9 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 30 40~100 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Flange stopper 30 30 20~99.9 13~25 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 3 3 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 3 3 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 4 3 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 4 3 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 4 4 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 4 4 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 3 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 3 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 4 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 4 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 5 40~80 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 5 90~100 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 5 5 13~99.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 3 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 3 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 4 40~70 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 4 13~69.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 5 40~80 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 5 90~100 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 5 13~99.9 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 6 40~80 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 6 90~100 0~90
- 5 Days Compliant Powdered high-speed steel Double-flanged 6 6 13~99.9 0~90

Basic Information

Shank type Blank With/without jector W/O Surface treatment None

Configure

Clear All

Specification/Dimensions

  • Type

    • PHTB
    • PHKB
    • HKB
    • HTB
    • HFB
    • HPB
    • PHPB
    • HMB
    • PHWB
    • HWB
    • PHFB
    • PHMB
  • Shank type

    • Blank
  • With/without jector

    • W/O
  • Material

    • SKD11 Equivalent
    • SKH51 Equivalent
    • Powdered high-speed steel
  • Surface treatment

    • None
  • Shank (mounting part) shape

    • Standard
    • Tapped
    • With key groove
    • Single-flanged
    • Double-flanged
    • Flange stopper
  • V (Shank)(mm)

    • 3
    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 22
    • 25
    • 28
    • 30
    • 40
    • 50
  • H (Shank)(mm)

    • 3
    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 22
    • 25
    • 28
    • 30
  • F (Flange position designation)(°)

    • 0
    • 90
  • K (Key groove position designation)(°)

    • 0
    • 90
  • L (L dimension)(mm)

    • 80.1
    • 89.9
    • 90
    • 100
    [40-100/10mm increments]
  • LC (Full length alteration)(mm)

    [13-100/0.1mm increments]
  • T (Key groove position)(mm)

    • 13
    • 16
    • 20
    • 22
    • 25
    [2-60/0.1mm increments]
  • TF (Head position designation)(°)

    • 0
    • 90
  • WF (Flange position designation)(°)

    • 0
    • 90
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 5 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry