Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Short Block Punch Blanks (Part Numbers)

Click this image to zoom it.

VOID

  • SKD11
  • POWDER HSS
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Material Shank (mounting part) shape V (Shank)
(mm)
H (Shank)
(mm)
F (Flange position designation)
(°)
L (L dimension)
(mm)
LC (Full length alteration)
(mm)
WF (Flange position designation)
(°)
- 5 Days Compliant SKD11 Equivalent Double-flanged 20 13 13~25 0~90
- 5 Days Compliant SKD11 Equivalent Double-flanged 20 13 13.1~24.9 0~90
- 5 Days Compliant SKD11 Equivalent Double-flanged 20 16 13~25 0~90
- 5 Days Compliant SKD11 Equivalent Double-flanged 20 16 13.1~24.9 0~90
- 5 Days Compliant SKD11 Equivalent Double-flanged 20 20 13~25 0~90
- 5 Days Compliant SKD11 Equivalent Double-flanged 20 20 13.1~24.9 0~90
- 5 Days Compliant Powdered high-speed steel Single-flanged 6 6 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 6 6 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 8 6 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 8 6 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 8 8 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 8 8 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 10 6 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 10 6 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 10 8 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 10 8 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 10 10 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 10 10 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 6 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 6 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 8 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 8 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 10 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 10 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 13 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 13 13 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 16 6 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 16 6 0~90 13.1~24.9
- 5 Days Compliant Powdered high-speed steel Single-flanged 16 8 0~90 13~25
- 5 Days Compliant Powdered high-speed steel Single-flanged 16 8 0~90 13.1~24.9

Basic Information

Shank type Blank With/without jector W/O Surface treatment None

Configure

Clear All

Specification/Dimensions

  • Type

    • PHMBS
    • HWBS
    • HMBS
    • PHFBS
    • PHWBS
    • HFBS
  • Shank type

    • Blank
  • With/without jector

    • W/O
  • Material

    • SKD11 Equivalent
    • Powdered high-speed steel
  • Surface treatment

    • None
  • Shank (mounting part) shape

    • Tapped
    • Single-flanged
    • Double-flanged
  • V (Shank)(mm)

    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
  • H (Shank)(mm)

    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
  • F (Flange position designation)(°)

    • 0
    • 90
  • L (L dimension)(mm)

    • 13
    • 16
    • 20
    • 25
  • LC (Full length alteration)(mm)

    [13.1-24.9/0.1mm increments]
  • WF (Flange position designation)(°)

    • 0
    • 90
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 5 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry