Empowering Engineers with

Configurable Components

Our business hours: Mon. - Fri. 7 a.m. - 9 p.m. ET | Sat. 8 a.m - 5 p.m. ET.

All Categories

Category Search
Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Brand Search
Brand List

Tapped Pilot Punches DLC Coating Tapered Tip Type (Part Numbers)

Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Surface treatment Shank diameter D tolerance B (Tip length/tip length) D (Shank diameter)
(mm)
L (L dimension)
(mm)
LC (Full length alteration)
(mm)
P (Tip dimension)
(mm)
PC (Tip dimension alteration)
(mm)
- 16 Days Compliant DLC foundation WPC m5 L 13 32~101.9 6~12.99
- 16 Days Compliant DLC foundation WPC m5 L 13 32~101.9 3~5.99
- 16 Days Compliant DLC foundation WPC m5 L 16 62~102 10~15.99
- 16 Days Compliant DLC foundation WPC m5 L 16 62~102 5~9.99
- 16 Days Compliant DLC foundation WPC m5 L 16 32~101.9 10~15.99
- 16 Days Compliant DLC foundation WPC m5 L 16 32~101.9 5~9.99
- 16 Days Compliant DLC foundation WPC m5 L 20 62~102 13~19.99
- 16 Days Compliant DLC foundation WPC m5 L 20 62~102 6.5~12.99
- 16 Days Compliant DLC foundation WPC m5 L 20 32~101.9 13~19.99
- 16 Days Compliant DLC foundation WPC m5 L 20 32~101.9 6.5~12.99
- 16 Days Compliant DLC foundation WPC m5 L 25 62~102 18~24.99
- 16 Days Compliant DLC foundation WPC m5 L 25 62~102 9~17.99
- 16 Days Compliant DLC foundation WPC m5 L 25 32~101.9 18~24.99
- 16 Days Compliant DLC foundation WPC m5 L 25 32~101.9 9~17.99
- 16 Days Compliant DLC foundation WPC m5 S 5 42~72 2~4.99
- 16 Days Compliant DLC foundation WPC m5 S 5 42~72 1~1.99
- 16 Days Compliant DLC foundation WPC m5 S 5 32~71.9 2~4.99
- 16 Days Compliant DLC foundation WPC m5 S 5 32~71.9 1~1.99
- 16 Days Compliant DLC foundation WPC m5 S 6 42~72 2.5~5.99
- 16 Days Compliant DLC foundation WPC m5 S 6 42~72 1.25~2.49
- 16 Days Compliant DLC foundation WPC m5 S 6 32~71.9 2.5~5.99
- 16 Days Compliant DLC foundation WPC m5 S 6 32~71.9 1.25~2.49
- 16 Days Compliant DLC foundation WPC m5 S 8 42~92 3~7.99
- 16 Days Compliant DLC foundation WPC m5 S 8 42~92 1.5~2.99
- 16 Days Compliant DLC foundation WPC m5 S 8 32~91.9 3~7.99
- 16 Days Compliant DLC foundation WPC m5 S 8 32~91.9 1.5~2.99
- 16 Days Compliant DLC foundation WPC m5 S 10 42~102 3~9.99
- 16 Days Compliant DLC foundation WPC m5 S 10 42~102 1.5~2.99
- 16 Days Compliant DLC foundation WPC m5 S 10 32~101.9 3~9.99
- 16 Days Compliant DLC foundation WPC m5 S 10 32~101.9 1.5~2.99

Basic Information

Shank type Standard Tip shape Tapered tip Material Powdered high-speed steel
Mounting plate Punch plate Shank (mounting part) shape Tapped

Configure

Clear All

Specification/Dimensions

  • Type

    • AN-PTPMAS
    • N-PTPMAS
    • NW-PTPMAS
    • NW-PTPMAL
    • ANW-PTPMAL
    • AN-PTPMAX
    • ANW-PTPMAS
    • NW-PTPMAX
    • N-PTPMAX
    • ANW-PTPMAX
    • AN-PTPMAL
    • N-PTPMAL
  • Shank type

    • Standard
  • Tip shape

    • Tapered tip
  • Material

    • Powdered high-speed steel
  • Surface treatment

    • DLC foundation WPC
    • Without DLC foundation
  • Mounting plate

    • Punch plate
  • Shank (mounting part) shape

    • Tapped
  • Shank diameter D tolerance

    • +0.005/0
    • m5
  • B (Tip length/tip length)

    • L
    • S
    • X
  • D (Shank diameter)(mm)

    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 25
  • L (L dimension)(mm)

    [42-102/10mm increments]
  • LC (Full length alteration)(mm)

    [32-101.9/0.1mm increments]
  • P (Tip dimension)(mm)

    [2-24.99/0.01mm increments]
  • PC (Tip dimension alteration)(mm)

    [1-17.99/0.01mm increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 16 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext. 370) / FAX:847-843-9107
Mon. - Fri. 9 a.m. - 6 p.m. ET
Technical Inquiry