Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Pilot Punches with Locating Dowel Holes DLC Coating Sharp Tip Angle Type (Part Numbers)

Pilot Punches with Locating Dowel Holes  DLC Coating  Sharp Tip Angle Type

  • FLANGE
  • SKH51
  • POWDER HSS
  • DLC
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Surface treatment B (Tip length/tip length) D (Shank diameter)
(mm)
A (Taper angle)
(°)
L (L dimension)
(mm)
LC (Full length alteration)
(mm)
P (Tip dimension)
(mm)
PC (Tip dimension alteration)
(mm)
- 10 Days Compliant DLC foundation WPC S 13 10~30 42~122 6~8
- 10 Days Compliant DLC foundation WPC S 13 15~30 42~122 9~12
- 10 Days Compliant DLC foundation WPC S 13 10~30 42~122 3~5.99
- 10 Days Compliant DLC foundation WPC S 13 10~30 32~121.9 6~8
- 10 Days Compliant DLC foundation WPC S 13 15~30 32~121.9 9~12
- 10 Days Compliant DLC foundation WPC S 13 10~30 32~121.9 3~5.99
- 10 Days Compliant DLC foundation WPC S 16 15~30 42~122 10~14
- 10 Days Compliant DLC foundation WPC S 16 20~30 42~122 15
- 10 Days Compliant DLC foundation WPC S 16 10~30 42~122 5~8
- 10 Days Compliant DLC foundation WPC S 16 15~30 42~122 9~9.99
- 10 Days Compliant DLC foundation WPC S 16 15~30 32~121.9 10~14
- 10 Days Compliant DLC foundation WPC S 16 20~30 32~121.9 15
- 10 Days Compliant DLC foundation WPC S 16 10~30 32~121.9 5~8
- 10 Days Compliant DLC foundation WPC S 16 15~30 32~121.9 9~9.99
- 10 Days Compliant DLC foundation WPC S 20 15~30 42~122 13~14
- 10 Days Compliant DLC foundation WPC S 20 20~30 42~122 15~19
- 10 Days Compliant DLC foundation WPC S 20 10~30 42~122 6.5~8
- 10 Days Compliant DLC foundation WPC S 20 15~30 42~122 9~12.99
- 10 Days Compliant DLC foundation WPC S 20 15~30 32~121.9 13~14
- 10 Days Compliant DLC foundation WPC S 20 20~30 32~121.9 15~19
- 10 Days Compliant DLC foundation WPC S 20 10~30 32~121.9 6.5~8
- 10 Days Compliant DLC foundation WPC S 20 15~30 32~121.9 9~12.99
- 10 Days Compliant DLC foundation WPC S 25 20~30 42~122 18~19
- 10 Days Compliant DLC foundation WPC S 25 25~30 42~122 20~24
- 10 Days Compliant DLC foundation WPC S 25 15~30 42~122 9~14
- 10 Days Compliant DLC foundation WPC S 25 20~30 42~122 15~17.99
- 10 Days Compliant DLC foundation WPC S 25 20~30 32~121.9 18~19
- 10 Days Compliant DLC foundation WPC S 25 25~30 32~121.9 20~24
- 10 Days Compliant DLC foundation WPC S 25 15~30 32~121.9 9~14
- 10 Days Compliant DLC foundation WPC S 25 20~30 32~121.9 15~17.99

Basic Information

Shank type Standard Tip shape Sharp tip angle Material SKD11 Equivalent
Mounting plate Punch plate Shank (mounting part) shape With locating dowel hole Shank diameter D tolerance m5

Configure

Clear All

Specification/Dimensions

  • Type

    • NW-ATALC
    • N-ATAXC
    • NW-ATAXC
    • NW-ATASC
    • N-ATASC
    • N-ATALC
  • Shank type

    • Standard
  • Tip shape

    • Sharp tip angle
  • Material

    • SKD11 Equivalent
  • Surface treatment

    • DLC foundation WPC
    • Without DLC foundation
  • Mounting plate

    • Punch plate
  • Shank (mounting part) shape

    • With locating dowel hole
  • Shank diameter D tolerance

    • m5
  • B (Tip length/tip length)

    • L
    • S
    • X
  • D (Shank diameter)(mm)

    • 10
    • 13
    • 16
    • 20
    • 25
  • A (Taper angle)(°)

    [10-30/5° increments]
  • L (L dimension)(mm)

    [42-142/10mm increments]
  • LC (Full length alteration)(mm)

    [32-141.9/0.1mm increments]
  • P (Tip dimension)(mm)

    [3-24.99/0.01mm increments]
  • PC (Tip dimension alteration)(mm)

    [1.5-17.99/0.01mm increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 10 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry