Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Chamfering Punches DLC Coating -A Type- (Part Numbers)

Click this image to zoom it.

VOID

  • SKH51
  • POWDER HSS
  • DLC
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Tip shape Material Surface treatment Shank (mounting part) shape D (Shank diameter)
(mm)
L (L dimension)
(mm)
P (Tip dimension)
(mm)
PC (Tip dimension alteration)
(mm)
F
(mm)
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 6 30~90 1~1.99 28~85.9
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 8 30~90 3~7 28~87.5
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 8 30~90 1.5~2.99 28~85.4
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 10 30~100 3~9 28~97.5
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 10 30~100 1.5~2.99 28~94.4
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 13 30~100 6~12 28~97.5
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 13 30~100 3~5.99 28~94.4
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 16 30~100 10~15 28~97.5
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 16 30~100 5~9.99 28~94.9
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 20 30~100 13~19 28~97.5
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 20 30~100 6.5~12.99 28~94.4
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 25 30~100 18~24 28~97.5
- 10 Days Compliant A type tip pilot SKH51 Equivalent DLC foundation WPC Standard 25 30~100 9~17.99 28~94.4
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 5 30~70 2~4 28~67.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 5 30~70 1~1.99 28~66.4
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 6 30~70 2~5 28~67.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 6 30~70 1~1.99 28~65.9
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 8 30~90 3~7 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 8 30~90 1.5~2.99 28~85.4
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 10 30~90 3~9 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 10 30~90 1.5~2.99 28~84.4
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 13 30~90 6~12 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 13 30~90 3~5.99 28~84.4
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 16 30~90 10~15 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 16 30~90 5~9.99 28~84.9
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 20 30~900 13~19 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 20 30~900 6.5~12.99 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 25 30~900 18~24 28~87.5
- 10 Days Compliant A type tip straight Powdered high-speed steel DLC foundation WPC Tapped 25 30~900 9~17.99 28~87.5
- 10 Days Compliant A type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 5 30~70 2~4 28~67.5

Basic Information

Tip shape A

Configure

Clear All

Specification/Dimensions

  • Type

    • NW-MRHMUA
    • GN-PSRMUA
    • N-MRHMUA
    • N-HSRMUA
    • GNW-PHMUA
    • GN-HSRMUA
    • GNW-HSRMUA
    • NW-HSRMUA
    • GN-PHMUA
    • NW-PSRMUA
    • NW-SHMUA
    • N-PHMUA
    • NW-MPHMUA
    • N-SHMUA
    • GNW-SHMUA
    • N-MPHMUA
    • NW-PHMUA
    • GN-SHMUA
    • N-PSRMUA
    • GNW-PSRMUA
  • Tip shape

    • A type tip straight
    • A type tip pilot
  • Tip shape

    • A
  • Material

    • SKH51 Equivalent
    • Powdered high-speed steel
  • Surface treatment

    • Without DLC foundation
    • DLC foundation WPC
  • Shank (mounting part) shape

    • Standard
    • Key flat
    • Tapped
  • D (Shank diameter)(mm)

    • 3
    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 25
  • L (L dimension)(mm)

    [30-900/0.1mm increments]
  • P (Tip dimension)(mm)

    [1-24/0.01mm increments]
  • PC (Tip dimension alteration)(mm)

    [1-17.99/0.01mm increments]
  • F(mm)

    [28-97.5/0.1mm increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 10 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry