Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Chamfering Punches DLC Coating -B Type- (Part Numbers)

Click this image to zoom it.

VOID

  • SKH51
  • POWDER HSS
  • DLC
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Tip shape Material Surface treatment Shank (mounting part) shape D (Shank diameter)
(mm)
L (L dimension)
(mm)
P (Tip dimension)
(mm)
PC (Tip dimension alteration)
(mm)
C
(mm)
F
(mm)
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 10 30~90 1.5~2.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 13 30~90 6~10.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 13 30~90 3~5.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 16 30~90 10~13.8 0.5~2.4 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 16 30~90 5~9.99 0.5~2.4 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 20 30~900 13~17.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 20 30~900 6.5~12.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 25 30~900 18~22.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Tapped 25 30~900 9~17.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 5 30~70 2~2.8 0.5~0.9 28~67.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 5 30~70 1~1.99 0.5~0.9 28~67.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 6 30~70 2~3.8 0.5~1.4 28~67.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 6 30~70 1~1.99 0.5~1.4 28~67.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 8 30~90 3~5.8 0.5~1.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 8 30~90 1.5~2.99 0.5~1.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 10 30~90 3~7.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 10 30~90 1.5~2.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 13 30~90 6~10.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 13 30~90 3~5.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 16 30~90 10~13.8 0.5~2.4 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 16 30~90 5~9.99 0.5~2.4 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 20 30~900 13~17.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 20 30~900 6.5~12.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 25 30~900 18~22.8 0.5~2.9 28~87.5
- 10 Days Compliant B type tip pilot Powdered high-speed steel DLC foundation WPC Tapped 25 30~900 9~17.99 0.5~2.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Standard 4 30~90 1~1.8 0.5~0.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Standard 5 30~90 2~2.8 0.5~0.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Standard 5 30~90 1~1.99 0.5~0.9 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Standard 6 30~90 2~3.8 0.5~1.4 28~87.5
- 10 Days Compliant B type tip straight Powdered high-speed steel DLC foundation WPC Standard 6 30~90 1~1.99 0.5~1.4 28~87.5

Basic Information

Tip shape A

Configure

Clear All

Specification/Dimensions

  • Type

    • N-SHMUB
    • NW-PHMUB
    • NW-MRHMUB
    • N-PSRMUB
    • NW-PSRMUB
    • N-MPHMUB
    • GN-PHMUB
    • GN-PSRMUB
    • GN-HSRMUB
    • GNW-PSRMUB
    • NW-MPHMUB
    • GNW-SHMUB
    • NW-SHMUB
    • GNW-HSRMUB
    • NW-HSRMUB
    • GN-SHMUB
    • N-HSRMUB
    • N-PHMUB
    • N-MRHMUB
    • GNW-PHMUB
  • Tip shape

    • B type tip straight
    • B type tip pilot
  • Tip shape

    • A
  • Material

    • SKH51 Equivalent
    • Powdered high-speed steel
  • Surface treatment

    • Without DLC foundation
    • DLC foundation WPC
  • Shank (mounting part) shape

    • Standard
    • Key flat
    • Tapped
  • D (Shank diameter)(mm)

    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 25
  • L (L dimension)(mm)

    [30-900/0.1mm increments]
  • P (Tip dimension)(mm)

    [1-1.8/0.01mm increments] [2-17.8/0.01mm increments] [18-22.8/0.01mm increments]
  • PC (Tip dimension alteration)(mm)

    [1-17.99/0.01mm increments]
  • C(mm)

    [0.5-2.9/0.1mm increments]
  • F(mm)

    [28-97.5/0.1mm increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 10 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry