Empowering Engineers with

Configurable Components

Our business hours: Mon. - Fri. 7 a.m. - 9 p.m. ET | Sat. 8 a.m - 5 p.m. ET.

All Categories

Category Search
Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Safety Products
Press Die Components
Plastic Mold Components

Brand Search
Brand List

Drawing Punches DLC Coating (Part Numbers)

Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Tip shape Material Surface treatment Shank (mounting part) shape D (Shank diameter)
(mm)
L (L dimension)
(mm)
PC (P dimension alteration)
(mm)
A
(°)
E
(mm)
F
(mm)
K
(°)
P
(mm)
Q
(mm)
R
(mm)
S
(mm)
V
(mm)
Y
(°)
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 6 40~80 1~1.99 2~20 1.2~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 8 40~100 3~8 2~20 1.5~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 8 40~100 1.5~2.99 2~20 1.5~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 10 40~100 3~10 2~20 1.5~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 10 40~100 1.5~2.99 2~20 1.5~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 13 40~100 6~13 2~20 2~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 13 40~100 3~6 2~20 2~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 16 40~100 10~16 2~20 3~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 16 40~100 5~10 2~20 3~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 20 40~100 13~20 2~20 3~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 20 40~100 6.5~13 2~20 3~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 25 40~100 18~25 2~20 4~20
- 10 Days Compliant 10C Powdered high-speed steel DLC foundation WPC Tapped 25 40~100 9~18 2~20 4~20
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0 0 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0.1~9.6 0 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0.5~15 0 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0 0.1~10 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0.1~9.6 0.1~10 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0.5~15 0.1~10 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0 0.5~15 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0.1~9.6 0.5~15 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 40~98 2~4.99 0.5~15 0.5~15 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0 0 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0.1~9.6 0 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0.5~15 0 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0 0.1~10 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0.1~9.6 0.1~10 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0.5~15 0.1~10 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0 0.5~15 1.2~4.9 45~90
- 10 Days Compliant 10D Powdered high-speed steel DLC foundation WPC Tapped 5 40~80 1.2~1.99 40~98 0.1~9.6 0.5~15 1.2~4.9 45~90

Basic Information

With/without jector W/O

Configure

Clear All

Specification/Dimensions

  • Type

    • N-PH(2-10)D
    • NW-MPH(2-10)C
    • NW-SH(2-10)D
    • NW-PH(2-6)A
    • N-MPH(2-6)A
    • N-PH(2-10)C
    • NW-MPH(2-8)B
    • N-PH(2-6)A
    • N-SH(2-10)D
    • NW-MPH(2-6)A
    • NW-PH(2-10)D
    • N-SH(2-10)C
    • N-SH(2-8)B
    • N-SH(2-6)A
    • N-PH(2-8)B
    • N-MPH(2-10)C
    • NW-SH(2-6)A
    • NW-SH(2-8)B
    • NW-PH(2-10)C
    • NW-PH(2-8)B
    • NW-SH(2-10)C
    • N-MPH(2-10)D
    • NW-MPH(2-10)D
    • N-MPH(2-8)B
  • With/without jector

    • W/O
  • Tip shape

    • 2A
    • 3A
    • 4A
    • 6A
    • 2B
    • 3B
    • 4B
    • 5B
    • 6B
    • 7B
    • 8B
    • 2C
    • 3C
    • 4C
    • 5C
    • 6C
    • 7C
    • 8C
    • 9C
    • 10C
    • 2D
    • 3D
    • 4D
    • 5D
    • 6D
    • 7D
    • 8D
    • 9D
    • 10D
  • Material

    • SKH51
    • Powdered high-speed steel
  • Surface treatment

    • Without DLC foundation
    • DLC foundation WPC
  • Shank (mounting part) shape

    • Regular
    • Tapped
  • D (Shank diameter)(mm)

    • 3
    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 25
  • L (L dimension)(mm)

    [40-100/0.1mm increments] [40-80/0.01mm increments]
  • PC (P dimension alteration)(mm)

    [1-1.99/0.001mm increments] [1-18/0.01mm increments] [3-6/0.001mm increments]
  • A(°)

    [1-89/0.01° increments] [1-89/1° increments]
  • E(mm)

    [1.1-24.99/0.01mm increments]
  • F(mm)

    [10-78/0.01mm increments] [10-99.9/0.1mm increments]
  • K(°)

    [1-89/0.01° increments] [1-89/1° increments]
  • P(mm)

    [2-25/0.01mm increments] [2-4/0.001mm increments]
  • Q(mm)

    • 0
    [0.01-9.6/0.5mm increments] [0.1-15/0.1mm increments]
  • R(mm)

    • 0
    [0-15/0.1mm increments] [0.01-9.6/0.5mm increments] [0.5-15/0.01mm increments]
  • S(mm)

    [0.5-57/0.1mm increments] [0.6-20/0.01mm increments]
  • V(mm)

    [1-2.9/0.1mm increments] [1-24.99/0.01mm increments]
  • Y(°)

    [45-90/1° increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 10 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext. 370) / FAX:847-843-9107
Mon. - Fri. 9 a.m. - 6 p.m. ET
Technical Inquiry