Empowering Engineers with

Configurable Components

Our business hours are 7:00 am ~ 9:00 pm ET (Monday to Friday).

All Categories

Automation Components
Fasteners
Materials
Wiring Components
Electrical & Controls
Cutting Tools
Processing Tools
Press Die Components
Plastic Mold Components

Drawing Punches DLC Coating (Part Numbers)

Click this image to zoom it.

VOID

  • SKH51
  • POWDER HSS
  • DLC
Part Number Configured Part Number is shown.
Part Number Standard Unit Price Volume Discount Days to Ship? RoHS Tip shape Material Surface treatment Shank (mounting part) shape D (Shank diameter)
(mm)
L (L dimension)
(mm)
PC (P dimension alteration)
(mm)
A
(°)
E
(mm)
F
(mm)
K
(°)
P
(mm)
Q
(mm)
R
(mm)
S
(mm)
V
(mm)
Y
(°)
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 4 40~80 1~2 1~89 34~78 1~3.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 5 40~80 1~89 34~78 2~5 1.2~4.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 5 40~80 1~2 1~89 34~78 1.2~4.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 6 40~80 1~89 34~78 2~6 1.2~5.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 6 40~80 1~2 1~89 34~78 1.2~5.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 8 40~100 1~89 10~98 3~8 1.5~7.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 8 40~100 1.5~3 1~89 10~98 1.5~7.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 10 40~100 1~89 10~98 3~10 1.5~9.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 10 40~100 1.5~3 1~89 10~98 1.5~9.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 13 40~100 1~89 10~98 6~13 2~12.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 13 40~100 3~6 1~89 10~98 2~12.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 16 40~100 1~89 10~98 10~16 3~15.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 16 40~100 5~10 1~89 10~98 3~15.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 20 40~100 1~89 10~98 13~20 3~19.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 20 40~100 6.5~13 1~89 10~98 3~19.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 25 40~100 1~89 10~98 18~25 4~24.96
- 10 Days Compliant 4C Powdered high-speed steel DLC foundation WPC Regular 25 40~100 9~18 1~89 10~98 4~24.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 3 40~80 1~89 10~89 2~3 0.5~15 1~15 1~2.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 3 40~80 1~2 1~89 10~89 0.5~15 1~15 1~2.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 4 40~80 1~89 10~89 2~4 0.5~15 1~15 1~3.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 4 40~80 1~2 1~89 10~89 0.5~15 1~15 1~3.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 5 40~80 1~89 10~89 2~5 0.5~15 1~15 1.2~4.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 5 40~80 1~2 1~89 10~89 0.5~15 1~15 1.2~4.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 6 40~80 1~89 10~89 2~6 0.5~15 1~15 1.2~5.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 6 40~80 1~2 1~89 10~89 0.5~15 1~15 1.2~5.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 8 40~100 1~89 10~89 3~8 0.5~15 1~15 1.5~7.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 8 40~100 1.5~3 1~89 10~89 0.5~15 1~15 1.5~7.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 10 40~100 1~89 10~89 3~10 0.5~15 1~15 1.5~9.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 10 40~100 1.5~3 1~89 10~89 0.5~15 1~15 1.5~9.96
- 10 Days Compliant 4D Powdered high-speed steel DLC foundation WPC Regular 13 40~100 1~89 10~97 6~13 0.5~15 1~15 2~12.96

Basic Information

With/without jector W/O

Configure

Clear All

Specification/Dimensions

  • Type

    • NW-SH(2-8)B
    • NW-PH(2-10)C
    • NW-PH(2-8)B
    • NW-SH(2-10)C
    • N-PH(2-10)D
    • N-MPH(2-10)D
    • NW-MPH(2-10)D
    • NW-MPH(2-10)C
    • N-MPH(2-8)B
    • NW-SH(2-10)D
    • NW-PH(2-6)A
    • N-MPH(2-6)A
    • NW-SH(2-6)A
    • N-PH(2-10)C
    • NW-MPH(2-8)B
    • N-PH(2-6)A
    • N-SH(2-10)D
    • NW-MPH(2-6)A
    • NW-PH(2-10)D
    • N-SH(2-10)C
    • N-SH(2-8)B
    • N-SH(2-6)A
    • N-PH(2-8)B
    • N-MPH(2-10)C
  • With/without jector

    • W/O
  • Tip shape

    • 2A
    • 3A
    • 4A
    • 6A
    • 2B
    • 3B
    • 4B
    • 5B
    • 6B
    • 7B
    • 8B
    • 2C
    • 3C
    • 4C
    • 5C
    • 6C
    • 7C
    • 8C
    • 9C
    • 10C
    • 2D
    • 3D
    • 4D
    • 5D
    • 6D
    • 7D
    • 8D
    • 9D
    • 10D
  • Material

    • SKH51
    • Powdered high-speed steel
  • Surface treatment

    • Without DLC foundation
    • DLC foundation WPC
  • Shank (mounting part) shape

    • Regular
    • Tapped
  • D (Shank diameter)(mm)

    • 3
    • 4
    • 5
    • 6
    • 8
    • 10
    • 13
    • 16
    • 20
    • 25
  • L (L dimension)(mm)

    [40-100/0.1mm increments] [40-80/0.01mm increments]
  • PC (P dimension alteration)(mm)

    [1-1.99/0.001mm increments] [1-18/0.01mm increments] [3-6/0.001mm increments]
  • A(°)

    [1-89/0.01° increments] [1-89/1° increments]
  • E(mm)

    [1.1-24.99/0.01mm increments]
  • F(mm)

    [10-78/0.01mm increments] [10-99.9/0.1mm increments]
  • K(°)

    [1-89/0.01° increments] [1-89/1° increments]
  • P(mm)

    [2-25/0.01mm increments] [2-4/0.001mm increments]
  • Q(mm)

    • 0
    [0.01-9.6/0.5mm increments] [0.1-15/0.1mm increments]
  • R(mm)

    • 0
    [0-15/0.1mm increments] [0.01-9.6/0.5mm increments] [0.5-15/0.01mm increments]
  • S(mm)

    [0.5-57/0.1mm increments] [0.6-20/0.01mm increments]
  • V(mm)

    [1-2.9/0.1mm increments] [1-24.99/0.01mm increments]
  • Y(°)

    [45-90/1° increments]
  • CAD

    • 2D
    • 3D

Days to Ship

  • Days to Ship

    • ALL
    • 10 Days or Less

Tech Support

Die & Mold Division
TEL:847-843-9105 (ext.370) / FAX:847-843-9107
8:30 a.m. - 8:00 p.m. ET (Monday to Friday)
Technical Inquiry